DM GlobalLuxury

Palm Jumeirah

4-Bedroom at Ellington Ocean House

AED 49,284,828

availableOff-plan · Dec 2026

About the project

Ocean House by Ellington Properties is a refined residential development set on the iconic Palm Jumeirah, where architecture takes inspiration from the fluidity of the ocean. Comprising a basement, ground level, and nine residential floors, the building is defined by its soft curves and organic lines that echo the movement of water. The project offers an exclusive collection of just 88 residences, including elegantly designed 2 to 4-bedroom apartments and duplexes, each thoughtfully planned to maximize space, light, and functionality while maintaining a sense of understated luxury.

Bedrooms

4

Bathrooms

—

Area

8,717 sqft

View

—

Status

available

Developer

Ellington

This unit is part of Ellington Ocean House. See the full development for payment plans, floor plans and handover.

Amenities

  • Intimate Dining Experiences To Hire Private Chefs
  • Fitness And Yoga Studio With Direct Views Of The Pool And Gardens
  • 50-Metre Olympic Pool With Lounge Zones And Gardens
  • Dedicated Space For A Private- Club
  • Kid-Centric Water Entertainment
  • Movie-Theatre
  • Outdoor Seating Areas
  • Flexible Workspaces
  • Wellness Spa
  • Kids’ Play Area

Nearby

Driving distance from the project

  • 3.5 kmPalm Jumeirah (Atlantis)
  • 3.5 kmBurj Al Arab
  • 5.2 kmMall of the Emirates
  • 6.0 kmDubai Marina
  • 14 kmBurj Khalifa & Downtown Dubai

Nearby Schools

Driving distance from the project

  • 3.0 kmM. Ilham Islamic model school
  • 4.3 kmRaffles International School
  • 4.4 kmDubai American Academy
  • 4.6 kmمدرسة الأرقم الخاصة ALARQM PRIVATE SCHOOL
  • 5.1 kmDubai sweden academy

Nearby Hospitals

Driving distance from the project

  • 3.9 kmBest IVF Hospital in Dubai

Payment plan

50%

Down payment

At sales launch

20%

During construction

30%

On handover

Floor plan

4-Bedroom floor plan at Ellington Ocean HouseTap to open full size

Project timeline

  1. Construction started

    June 1, 2023

  2. Expected completion

    December 31, 2026